Dashboard
PM Program ID
Pending IFS push
IFS PM Program key
Description
Revision
Rev 0
IFS revision
Item Class
BOL_B
Bollards Family B
Process Class
CIV
Civil Maintenance
Object IDs
  • • BERTH02.999
  • • BOL03.33
  • • BOL04.33
  • • BOL05.33
  • • +6 more
Sites
BCN
APM Terminals Barcelona
DRAFT

Requires APPROVED status

WTT Steps

Flat Work Task Steps for the PM Program

Filtered to BCN-BOL_B-T001. Show all steps

3 work steps inside BCN-BOL_B-T001
RankGlobalGOS ComponentStageTypeDurationDowntimeQtyTriggersWork ListWTTWork InstructionExtended Instruction
WL10
WTTBCN-BOL_B-T001
Materials and resourcesWL: 10; WTT: BCN-BOL_B-T001
Step Materials rolled to generated Work Lists
Rolls to 10
Part NoDescriptionQtyUOM
No materials yet. Add a row to stage parts for this Work Step.
Proposed and selected resources
ProposedSelectedTechsWorkingDown
BCN-MECH
BCN Mechanical resource group
Using proposed - BCN Mechanical resource group
Generated Work Lists: 10
WL20
WTTBCN-BOL_B-T001
Materials and resourcesWL: 20; WTT: BCN-BOL_B-T001
Step Materials rolled to generated Work Lists
Rolls to 20
Part NoDescriptionQtyUOM
No materials yet. Add a row to stage parts for this Work Step.
Proposed and selected resources
ProposedSelectedTechsWorkingDown
BCN-HYDR
BCN Hydraulic resource group
Using proposed - BCN Hydraulic resource group
Generated Work Lists: 20
WL30
WTTBCN-BOL_B-T001
Materials and resourcesWL: 30; WTT: BCN-BOL_B-T001
Step Materials rolled to generated Work Lists
Rolls to 30
Part NoDescriptionQtyUOM
No materials yet. Add a row to stage parts for this Work Step.
Proposed and selected resources
ProposedSelectedTechsWorkingDown
BCN-INSP
BCN Inspection resource group
Using proposed - BCN Inspection resource group
Generated Work Lists: 30
Maintenance Trigger Definitions
NameKindTrigger definition
Every
Event code