Dashboard
Derived Basic Data
Derived Basic Data
Resolved mappings POP uses while editing, derived from mirrored IFS master data.
Site + Work Stage = Resource Group
POP resolves resource groups automatically from the PM Program site and each Work Step stage.
| Site | Site Name | Work Stage | Trade | Resource Group ID | Description |
|---|---|---|---|---|---|
| ALG | APM Terminals Algeciras | ELEC | Electrical | ALG-ELEC | ALG Electrical resource group |
| ALG | APM Terminals Algeciras | HYDR | Hydraulic | ALG-HYDR | ALG Hydraulic resource group |
| ALG | APM Terminals Algeciras | INSP | Inspection | ALG-INSP | ALG Inspection resource group |
| ALG | APM Terminals Algeciras | LUBE | Lubrication | ALG-LUBE | ALG Lubrication resource group |
| ALG | APM Terminals Algeciras | MECH | Mechanical | ALG-MECH | ALG Mechanical resource group |
| BCN | APM Terminals Barcelona | ELEC | Electrical | BCN-ELEC | BCN Electrical resource group |
| BCN | APM Terminals Barcelona | HYDR | Hydraulic | BCN-HYDR | BCN Hydraulic resource group |
| BCN | APM Terminals Barcelona | INSP | Inspection | BCN-INSP | BCN Inspection resource group |
| BCN | APM Terminals Barcelona | LUBE | Lubrication | BCN-LUBE | BCN Lubrication resource group |
| BCN | APM Terminals Barcelona | MECH | Mechanical | BCN-MECH | BCN Mechanical resource group |
| PSE | APM Terminals Port Said East | ELEC | Electrical | PSE-ELEC | PSE Electrical resource group |
| PSE | APM Terminals Port Said East | HYDR | Hydraulic | PSE-HYDR | PSE Hydraulic resource group |
| PSE | APM Terminals Port Said East | INSP | Inspection | PSE-INSP | PSE Inspection resource group |
| PSE | APM Terminals Port Said East | LUBE | Lubrication | PSE-LUBE | PSE Lubrication resource group |
| PSE | APM Terminals Port Said East | MECH | Mechanical | PSE-MECH | PSE Mechanical resource group |